Fabrication for Conveyor and Material Handling Systems

Budde builds the frames, guards, chutes, and support weldments that keep conveyors aligned and running, and our crews can install them in your plant.

Request a Quote

Material Handling Systems Built to Stay Aligned and Keep Running

Material handling systems run long hours under vibration and impact. Fabricated components have to line up with rollers, belts, and drives at installation, then hold that alignment for years. Long side frames and guard panels need to come out straight and match from one section to the next. If they don't, installers end up shimming and re-drilling in the field.

Much of this work is also custom. A conveyor line gets extended, a transfer point gets redesigned, or a guard has to fit around equipment that was never drawn. Builders and plant engineers need a fabricator who can work from field measurements as easily as from a CAD model.

Worker servicing conveyor rollers and frame

Capabilities for Conveyor and Handling Equipment

Long-part forming

Our Trumpf press brakes form parts up to 161 inches long with up to 250 tons of force, which covers most conveyor side frames, stringers, and long guard panels in a single piece. Axis precision of 0.0008 inch keeps flanges consistent along the full length.

Accurate hole patterns

Bearing mounts and cross-member holes have to line up across sections. Our CNC laser cutting holds 0.002 inch positioning accuracy and 0.001 inch repeatability on sheets up to 60 x 120 inches, so matching parts stay matched. Our laser cutting and bending page explains how we keep both processes in step.

Structural welding

MIG welding handles frames, legs, and support stands, with fixturing and weld sequencing planned to limit distortion. Stainless chutes and pans can be TIG welded where a cleaner joint is needed.

Engineering for retrofits

When a line changes, our design and engineering team can measure existing equipment, model the new parts in 3D CAD, and check fit before production. We can also reverse engineer worn components that have no drawings.

Installation in your facility

Our industrial installation crews come to your plant, install the parts we fabricated, and schedule the work to keep downtime short.

Material Handling Components We Build

01

Conveyor side frames and stringers

02

Guarding, safety panels, and pinch-point covers

03

Transfer chutes, hoppers, and spill pans

04

Drive covers and motor guards

05

Support stands, legs, and cross members

06

Control enclosures mounted on the line

07

Custom transitions and retrofit parts for existing systems

Why Conveyor Builders and Plant Teams Choose Budde

We can carry a job from field measurement to installed equipment. Design, fabrication, and installation stay with one team, so nobody has to translate between a fabricator and a separate installer.

Long parts are routine for us. A 161-inch bed means fewer splices in frames and guards, and that means fewer joints to align during installation.

Budde has fabricated industrial sheet metal in Dayton since 1922. Plant engineers call us when a part has no drawing, the deadline is tight, or the geometry is awkward.

Request a Quote for Material Handling Components

Share drawings, field measurements, or photos of the existing equipment. Let us know whether you need installation, and we'll include it in the quote.

Thank you. Your quote request has been received. Our team will review it and get back to you.